nepalkichori12 nepalkichori12
  • 03-07-2020
  • Mathematics
contestada

5. A worker can do a piece of
piece of wook
in 14 days.
How much coook does he do ini day!
. How much work does he do in 7 days?
lijIt he works for 2 days and leaves,
how much work is left to finish it?

Respuesta :

Sueraiuka
Sueraiuka Sueraiuka
  • 03-07-2020

Answer:

therefore the left work of worker will be 6/7 part of work

Ver imagen Sueraiuka
Answer Link

Otras preguntas

I need help. To see if i got it right
Write the equation of the line in slope intercept form that passes through the point (6,-2) and is parallel to the line y = -3x + 5.​
Jen and some friends share 40 jellybeans equally. Is the number that each friend gets greater than 40 or less than 40? Explain
Alfred Wegener named his proposed supercontinent _____.
Select all the rational numbers
CALLING ALL EXPERTS, PLEASE HELP ME WITH MY HOMEWORK!! WORTH A LOT OF POINTS AND WILL GIVE BRAINLIEST!!
What is the answer to −1.4 + (−1.2) ? (I've looked everywheres on Brainly and found no answers that I need.)
one quarter of a certain number added to one eighth of the same number is 12. What is the number​
simplify 7m+3n - (11-2m+n+5) -m+3n+8
Solve the equation. 3 - 3z= 12