hannahgrace31511 hannahgrace31511
  • 03-11-2021
  • Mathematics
contestada

A chef can finish a catering job in 4hr. His student can do the same job in 12hr. How long will it take them both to do the job if they work together

Respuesta :

shayy1616 shayy1616
  • 03-11-2021
12 divided by 4 equal 3
Ans:3hrs
Answer Link

Otras preguntas

Castor brought 6 3/4 small carrot cakes to share with 26 students in his class. Did Castor bring enough for each student to have 1/4 of a cake? (Yes..26 studen
how do you make 28/6 in to a mixed fraction in simplest form
Describe the rock cycle and include its constructive and destructive process. please help
What is 2/3 of 18? What is 2/3 of 24?
Have have the oceans and seas surrounding North Africa and Southwest Asia benefited the region?
what is 9 divided by 765 please show the work i really need help
Identify the type of chemical reaction. H2CO3 H2O + CO2 decomposition exchange reversible synthesis
How do I find precentges of money
Mark the statement if it accurately describes one of the steps taken to transform Paris. A. The wealthy people moved out to the suburbs. B. Broad boulevards
a grown tiger begin its life as a single fertilized egg explain why a tiger look so much different as an adult then it did as a single fertilized eggEnter your