pieman33333 pieman33333
  • 04-04-2018
  • Mathematics
contestada

Three workers can do a job in 28 hours. How many more workers are needed to do this job in 12 hours?

Respuesta :

MrRamon
MrRamon MrRamon
  • 13-04-2018
4 additional workers for 7 total workers.
if it takes 3 workers 28 hours to do work there are 84 total hours of work (3*28=84) to find how many workers it will take to get the work done in 12 hours divide 84 by 12. 84/12= 7 total workers. 7-3= 4 additional workers needed.
Answer Link
pranilraichura
pranilraichura pranilraichura
  • 08-03-2020

Answer:

4 workers

Step-by-step explanation:

Answer Link

Otras preguntas

If the President can no longer serve, who becomes President?
What is the approximate height of the average adult in centimeters?
round 75.4614 to the nearest thousandth
what is the cause to air pollution??? please help me!!!!
A sample of a substance has these characteristics: • melting point or 9811 K • hard. brittle solid at room temperature • poor conductor of heat and electricity
The excitation of an electron on the surface of a photocell required 5.0 x 10 –27 J of energy. Calculate the wavelength of light that was needed to excite the e
If both the President and the Vice President can no longer serve, who becomes President?
What is the political party of the President now?
Name one right only for United States citizens.
Name one war fought by the United States in the 1800s.