a contractor estimates that he can paint a house in 5 days using 6 men. if he actually uses 5 men for the job, how many days will they take to paint the house?

Respuesta :

Einstein08 Einstein08
  • 01-09-2018
it will take 4 days to paint the house with 5 men
Answer Link
tramserran
tramserran tramserran
  • 01-09-2018

1 house = 6 men x 5 days  = 30 man days

Need 30 man days with only 5 men: 30x = 5 men   →  x = 6

It will take 6 days for 5 men to complete the job.

Answer: 6 days


Answer Link

Otras preguntas

Explain what is the same about two fractions that are like fractions
what is the sum of 7/10 and 6/100
having troubles with inequalities.. 3.8x + 14.5 < 32
Explain what is the same about two fractions that are like fractions
which trinomial is equivalent to (3x-1)(x+4)
having troubles with inequalities.. 3.8x + 14.5 < 32
having troubles with inequalities.. 3.8x + 14.5 < 32
what is the sum of 7/10 and 6/100
what is the sum of 7/10 and 6/100
which trinomial is equivalent to (3x-1)(x+4)