pineapplebby21
pineapplebby21 pineapplebby21
  • 02-02-2019
  • Mathematics
contestada

it takes 20 people 24 days to build a barn. in how many days will the barn be built if they had 32 people working

Respuesta :

bluevortexwitepower bluevortexwitepower
  • 02-02-2019

Answer:

15 days

Step-by-step explanation:

Number of ppl it takes to build a barn in 24 days=20

Time it will take 32 people to build the barn=24*20/32=15 days

Answer Link

Otras preguntas

Kathy Thompson has determined that the value of her assets is $64,000 and the value of her debts is $23,000. The difference between these two is $41,000. The $4
If your best friend were bossy, cruel, or aggressive toward you, you’d probably find a new best friend. But some people think it’s OK to tolerate such behavior
Work out the unknown angle
why i got to watch ads
Question 4: Balancing Redox Equations (5 points) Use the following steps to balance the redox reaction below: Mg + Au* → Mg²+ + Au a. Write the oxidation and re
A high school band is selling tickets to its concert. The ticket prices are shown below what does the point (4, 40) represent Based on the graph? A. 4 tickets
What is the minimum hot holding temperature requirement for chicken strips
What allows us to maintain secure communications with a server without having to constantly re-authenticate
Where is a polar climate zone most likely located? A. In the middle of a continent B. In the Mediterranean C. Along the equator D. Above the Arctic Circle
What is a good chapbook title ideas for all my poems to go in​