seppy36
seppy36 seppy36
  • 13-05-2020
  • Mathematics
contestada

A construction company can remove 934 metric tons of dirt from a construction site in 412 hours.
What is the unit rate in metric tons per hour?

Write your answer as a fraction or a mixed number in simplest form.

Respuesta :

aksh2007
aksh2007 aksh2007
  • 14-05-2020

Answer:

2.27

Step-by-step explanation:

Answer Link

Otras preguntas

a number is k units to the left of 0 on the number line. describe the location of its opposite.
how do I write 0.25 as a fraction in its simplists form
arrange following numbers in increasing order 2.3,45.1,18.735,0.9862,7
Which statement is true? 500 is 10 times as much as 50 500 is one tenth as much as 50
a=(vf-vi)/t solve for tsolve for vi solve for vf
Two trains leave the station at the same time, one heading East and the other heading West. The westbound train is going 60mph. The eastbound train is going 80m
How did king james 1 important to the survival of the Jamestown settlers
Simplify and show your work -8 + 4i / 4 - 4i
Analyze how scientific thhought changes as new information is collected
What is 70,030,000 in scientific notation