how do you find the mean completion time of a PERT network diagram?​

Respuesta :

okekesarah01642112
okekesarah01642112 okekesarah01642112
  • 02-01-2021

Answer:

PERT is an estimating technique that uses a weighted average of three numbers (see below) to come up with a final estimate. The resulting PERT estimate is calculated as (O + 4M + P)/6. This is called a "weighted average" since the most likely estimate is weighted four times as much as the other two values.

Answer Link

Otras preguntas

divide 2y^3+8 by 2y+4. which expression represents the quotient and remainder?
4(x+0.2)=1.3 which value for x makes the sentence true? A.0.50, B.0.53, C.0.28, D.0.13
Which practice reduces the risk of a boating emergency? maintaining a safe speed based on other boat traffic operating quickly around potential hazards standin
What is the theme of No Gumption with examines from the story???
"the means of development which the individual loses by being prevented from gratifying his inclinations to the injury of others, are chiefly obtained at the ex
SPANISH HELP PLS THXXX helppp
what is 5r^2-18=-9 help please
Choose the answer: which best identifies and interprets a motif used in Anne Frank: The diary of a young girl?
Define a variable and write an expression for the phrase. the quotient of 2 times a number and 19
2⋅((42)^−1) A.1/2 B.1/4 C.1/8 D.1/16