ekitoiemmah341 ekitoiemmah341
  • 01-11-2021
  • Business
contestada

a budget that is prepared at the beginning of the period for a specific level of activity is called a ______ budget.

Respuesta :

carelesslyandria carelesslyandria
  • 12-11-2021

Answer: planning budget

Explanation:

Answer Link

Otras preguntas

A bicycle rim has a diameter of 0.65 m and a moment of inertia, measured about its center, of 0.25 kg⋅m2 . part a what is the mass of the rim? express your answ
Help fast? What is the equation, in slope-intercept form, of the line that is perpendicular to the line y – 4 = –2/3(x – 6) and passes through the point (−2, −
What does the root fort for the word fortify mean? Break Suffer Strong Move
A landscaper ordered 6 cubic yards of soil. So far she has used 90 cubic feet of soil. How many cubic feet of soil are left?
Pleaseeee help!!!! I will mark you as brainlinest for correct answer!!!!!!!
Black fur in mice (b) is dominant to brown fur (b). short tails (t) are dominant to long tails (t). what fraction of the progeny of the cross bbtt x bbtt will h
Why was it hard to catch criminals in the gilded age?
Which of these features is NOT found on the ocean floor
State two ways in a single-called organism, such as an amoeba, and a human body cell are alike
Geoffrey mumbled, softly “She could have fixed it. I know she could have.” Proofread the sentence to correct the punctuation of the quotation. Move the comma an